Friday 5 December 2025 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Dec 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). A Chandra press release was issued on Dec 1 describing a new symphony based on data from NASA’s Chandra X-ray Observatory and the James Webb Space Telescope. The symphony transforms astronomical observations into music that traces the life cycle of stars. By using data sonifications from Chandra together with Webb data, the new composition provides an unprecedented connection to space through music derived from actual observations. For details see: https://chandra.harvard.edu/press/25_releases/press_120125.html. The schedule of targets for the next week is shown below and includes observations of EXO 0748-676, which are follow-ups to a Target of Opportunity accepted on Apr 29, and observations of AT 2025abcr, which are follow-ups to a Target of Opportunity accepted on Nov 11. |
------------------------------------------
CygnusX-2 ACIS-S/HETG Dec 8
NGC3239 ACIS-S
3CR152 ACIS-S
GW170817 ACIS-S
3CR152 ACIS-S
GW170817 ACIS-S Dec 9
CenterofCOSMOS-Web ACIS-I
Radiation Belts Dec 10
NGC4548 ACIS-S
AT2025abcr ACIS-S
PuppisA HRC-I
Perseuscluster ACIS-I
AT2025abcr ACIS-S Dec 11
GaiaDR234127701256 ACIS-S
CygnusX-2 ACIS-S/HETG
Perseuscluster ACIS-I Dec 12
Radiation Belts
NGC4548 ACIS-S
Perseuscluster ACIS-I Dec 13
EXO0748-676 ACIS-S
Perseuscluster ACIS-I
EXO0748-676 ACIS-S
Perseuscluster ACIS-I Dec 14
2MASXJ17345436+5045 ACIS-S
Perseuscluster ACIS-I
CenterofCOSMOS-Web ACIS-I
CenterofCOSMOS-Web ACIS-I
Radiation Belts------------------------------------------
All spacecraft subsystems except HRC continued to support nominal operations.
Return to Status Reports