Operations CXO Status Report

Friday 4 November 2016 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

Of note this week was the Chandra Quarterly Review conducted on Nov 2 in Cambridge.

The schedule of targets for the next week is shown below and includes an observation of NGC 3227 coordinated with XMM and NuSTAR.



------------------------------------------
        Radiation Belts                     Nov  8
        Abell1795outskirts     ACIS-I
        Perseuscoldfront2      ACIS-I       Nov  9
        NGC3227                ACIS-S/HETG
        Abell1795outskirts     ACIS-I       Nov 10
        Radiation Belts                     Nov 11
        Perseuscoldfront2      ACIS-I
        Abell1795outskirts     ACIS-I
        BootesCy17-1           ACIS-I       Nov 12
        CygnusA-Nucleus        ACIS-I
        BootesCy17-1           ACIS-I
        Radiation Belts                     Nov 13
        G292.0+1.8             ACIS-I
        PSZ1G254.58-32.16      ACIS-S       Nov 14
        GALEXJ010724.7+1332    ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports