Operations CXO Status Report

Friday 11 October 2013 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Oct 9 to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below



------------------------------------------
        DeepField03            ACIS-I       Oct 14
        COSMOSLegacy           ACIS-I       Oct 15
        DeepField03            ACIS-I
        A0957                  ACIS-I       Oct 16
        Radiation Belts
        M31North               ACIS-S/HETG
        SgrA*                  ACIS-S       Oct 17
        hrc-7                  HRC-I
        hrc-6                  HRC-I        Oct 18
        ESO455-42              ACIS-S
        Radiation Belts                     Oct 19
        Markarian1040          ACIS-S/HETG
        Abell2626              ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.