CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 11 February 2005 11.00am EST
During the last week loads were replaned to ensure proper thermal
constraints for a propulsion line following a yellow limit violation
on 6 Feb. As a result of the replan, the order of targets DLS
J0514-4904 and 1249+3038 was changed to ensure a favorable temperature
profile.
The schedule of targets for the next week is shown below and includes a DDT observation of PSR J0437-4715. |
------------------------------------------
NGC 3690 ACIS-S Feb 13 1ES 1239+069 HRC-I Feb 14 RX J1308.8+2127 ACIS-S M87 ACIS-S Radiation Belts RX J1308.8+2127 ACIS-S Feb 15 Cygnus A ACIS-I cl1003+3253 ACIS-I cl1117+1744 ACIS-I Feb 16 Cygnus A ACIS-I Radiation Belts Feb 17 RX J0806.4-4123 ACIS-I Feb 18 PSR J0437-4715 ACIS-S 2MASS 194915-55101 ACIS-S SDSS J101627.32-00 ACIS-S RXCJ1213.3-2617 ACIS-S RX J1308.8+2127 ACIS-S Cygnus A ACIS-I Feb 19 cl0958+4702 ACIS-I cl0853+5759 ACIS-I Radiation Belts HZ43 HRC-I/LETG Feb 20 Vega ACIS-I Vega ACIS-S Vega HRC-I Vega (4 obs) HRC-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports