Operations CXO Status Report

Friday 11 September 2009 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

The schedule of targets for the next week is shown below and includes an observation of LP349-25 coordinated with the VLA and an observation of M31 coordinated with HST.

------------------------------------------
Radiation Belts                     Sep 13
Arp147                 ACIS-S
SN2006jd               ACIS-S
CEN A                  HRC-I        Sep 14
2PIGG_1671             ACIS-I
MACSJ0150.3-1005       ACIS-I
LP349-25               ACIS-S       Sep 15
Arp147                 ACIS-S
Radiation Belts                     Sep 16
N49                    ACIS-S
2PIGG_1671             ACIS-I
cl2137+0027            ACIS-S
BootesGroup39          ACIS-S       Sep 17
M31bulgeoff-field      ACIS-I
A98s                   ACIS-I
A98n                   ACIS-I
M31                    ACIS-I       Sep 18
Arp293                 ACIS-S
Radiation Belts
N49                    ACIS-S       Sep 19
2PIGG_1671             ACIS-I
M31bulgeoff-field      ACIS-I
SDSSJ215954.45-0021    ACIS-S       Sep 20
PKS2211-17             ACIS-S
IGRJ02088-0750         ACIS-I
SDSSJ022849.51-0901    ACIS-S
NGC1266                ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports