CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 26 September 2003 8.30am EDT
During the last week Chandra completed the observing schedule as planned.
Of note last week was the approval by the Flight Director Board of an update to the IRU-2 calibration k-constants based on data taken since the IRU swap in July. The observing schedule for next week is shown below and includes an observation of GX 339-4 coordinated with ASCA. |
------------------------------------------
Radiation Belts Sep 28 GX 339-4 ACIS-S NGC 752 ACIS-I Sep 29 Radiation Belts Oct 1 1RXS J020052.9-09243 ACIS-S NGC 1313 ACIS-I Oct 2 0550-683 ACIS-S G16.7+0.1 ACIS-S Oct 3 G85.9-0.6 ACIS-S NGC 5204 X-1 ACIS-S Radiation Belts AX J1226.8-6249 ACIS-S Oct 4 G351.2+0.1 ACIS-S 4C 37.43 Field ACIS-I RXJ1205 ACIS-S Oct 5 Her X-1 ACIS-S/HETG
------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to Status Reports