News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
Web Shortcuts
Chandra Blog
RSS Feed
Image Use Policy
Questions & Answers
Glossary of Terms
Operations CXO Status Report

Wednesday 22 September 1999 11.00am EST

During the last 24 hours observations of GTO targets continued up until the entry into the radiation belts. The regular ACIS pre-belt calibration source measurement was made, and the science instruments safed for belt passage. A post belt ACIS measurement will be completed at approx 4PM 9/22.

The observatory passed through its 3rd eclipse successfully at 5AM 9/22 and again showed performance that matched predictions. This eclipse lasted for 64 minutes. The next eclipse will occur at 8.55PM 9/24 and will last 69 minutes. Spacecraft systems continued to operated nominally.





Return to Status Reports