Friday 20 June 2025 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Jun 15, 16, and 17 to dump OBC-A and -B memory as a follow-up to the Jun 12 upload of the patch to update the Low Energy Transmission Grating insertion logic. The dump will be used to update the baseline memory images maintained on the ground. An issue occurred with data downlinked on Jun 12 during the comm pass with DSS-65 beginning at 5:15PM EDT. Due to a software issue in the DSN equipment, the data were partially corrupted and are unusable for science processing. Three observations were impacted and will be rescheduled in future weeks. The schedule of targets for the next week is shown below and includes an observation of SN2014ab coordinated with VLA. |
------------------------------------------
SN1941C HRC-I Jun 23 NGC4951 ACIS-S Radiation Belts [JDW2009]G359.55+0. ACIS-I LHS475 HRC-I Jun 24 NGC4951 ACIS-S SNRG1.9+0.3 ACIS-S SDSSJ134100.24+4225 ACIS-S A1795 ACIS-S SNRG1.9+0.3 ACIS-S Jun 25 SN2014ab ACIS-S SNRG1.9+0.3 ACIS-S IGRJ17381-2345 ACIS-S Jun 26 Radiation Belts Abell370 ACIS-I CasA ACIS-S SNRG15.9+0.2 ACIS-S ArLac HRC-I Jun 27 UGC695 ACIS-I HEPG015.284-10.582 ACIS-I Abell370 ACIS-I G29-38 HRC-I Abell2255 ACIS-I SNRG15.9+0.2 ACIS-S Jun 28 A1795 ACIS-I Radiation Belts Jun 29 [JDW2009]G359.55+0. ACIS-I NGC4298 ACIS-S G29-38 HRC-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports