News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 10 January 2025 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Jan 8 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below.



------------------------------------------
        Radiation Belts                     Jan 13
        NGC1300                ACIS-S
        SDSSJ082730.64+1921    ACIS-S
        PSRJ1418-6058          ACIS-I       Jan 14
        A1795                  ACIS-I
        SDSSJ082730.64+1921    ACIS-S
        PSRJ1418-6058          ACIS-I
        Abell795               ACIS-S       Jan 15
        PSOJ170.8326+20.208    ACIS-S
        SDSSJ131012.35+1656    ACIS-S
        Radiation Belts                     Jan 16
        NGC1300                ACIS-S
        Abell795               ACIS-S
        Abell370               ACIS-I
        NGC2775                ACIS-S       Jan 17
        SDSSJ145138.27+0903    ACIS-S
        NGC2775                ACIS-S
        SDSSJ160158.51+4705    ACIS-S
        HD75332                HRC-I
        IGRJ15550-4306         ACIS-I       Jan 18
        NGC4781                ACIS-S
        Radiation Belts
        Abell370               ACIS-I
        ZwCl0857.9+2107        ACIS-S       Jan 19
        Abell370               ACIS-I
        NGC2775                ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports