News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 1 September 2023 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

The schedule of targets for the next week is shown below and includes an observation of Terzan 6, which is a follow-up to a Target of Opportunity accepted on Jul 28 and is coordinated with VLA, an observation of ESO253-G003 coordinated with XMM-Newton, and an observation of AT2019ehz coordinated with VLA.



------------------------------------------
        ALPHACEN               HRC-I        Sep  3
        PSZ2G075.85+15.53      ACIS-S
        Radiation Belts                     Sep  4
        A2319                  ACIS-I
        G29-38                 HRC-I
        AT2019ehz              ACIS-S       Sep  5
        PSZ2G075.85+15.53      ACIS-S
        Abell2744              ACIS-I
        ESO253-G003            ACIS-S
        MR2251-178             HRC-S /LETG  Sep  6
        JWST-DTDF-1            ACIS-I
        Radiation Belts
        AM2353-291             ACIS-S       Sep  7
        JWST-DTDF-1            ACIS-I
        MR2251-178             HRC-S /LETG
        Terzan6                ACIS-S
        AM2353-291             ACIS-S       Sep  8
        JWST-DTDF-1            ACIS-I
        G29-38                 HRC-I
        JWST-DTDF-1            ACIS-I
        HD25457                ACIS-S       Sep  9
        Radiation Belts
        Abell2744              ACIS-I
        LMCDeepField04         ACIS-I       Sep 10
        Abell2744              ACIS-I
        B2.10441+29            ACIS-S
        Abell2744              ACIS-I
        MR2251-178             HRC-S /LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports