Operations CXO Status Report

Friday 29 January 2021 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load.

The schedule of targets for the next two weeks is shown below and includes an observation of V404 Cygni coordinated with the VLA.



------------------------------------------
        RXJ0911.4+0551         ACIS-S       Jan 31
        H1821+643              HRC-S /LETG
        MKN421                 ACIS-S/LETG  Feb  1
        2RXSJ161816.6+09305    ACIS-I
        IGRJ16318-4848         ACIS-S/HETG
        LTT3780                ACIS-S
        MKN421                 ACIS-S/LETG
        Radiation Belts                     Feb  2
        4FGLJ1358.3-6026       ACIS-I
        E0102-72.3             ACIS-I
        PGC1187281             ACIS-S
        H1821+643              HRC-S /LETG  Feb  3
        MKN421                 ACIS-S/LETG
        H1821+643              HRC-S /LETG
        MKN421                 ACIS-S/LETG
        H1821+643              HRC-S /LETG  Feb  4
        J162845.49+271742.7    ACIS-S
        MKN421                 ACIS-S/LETG
        Radiation Belts
        SDSSJ134248.86+6056    ACIS-S
        MKN421                 ACIS-S/LETG  Feb  5
        SDSSJ134800.13-0250    ACIS-S
        SN2012P                ACIS-S
        M82X-2                 HRC-I
        MKN421                 ACIS-S/LETG
        IGRJ16318-4848         ACIS-S/HETG  Feb  6
        MKN421                 ACIS-S/LETG
        V404Cygni              ACIS-S
        MKN421                 ACIS-S/LETG
        Radiation Belts                     Feb  7
        RXJ0911.4+0551         ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.