News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Operations CXO Status Report

Friday 6 November 2020 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Oct 30 and Oct 31 to dump OBC-A and -B memory as a follow-up to the flight software patches executed on Oct 29. The dump will be used to update the baseline memory image maintained on the ground. Real-time procedures were also executed on Nov 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE).

Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load.

The schedule of targets for the next week is shown below and include observations of SN2020tcw, which was accepted as a Target of Opportunity on Oct 16, and an observation of AT2020xnd, which was accepted as a Target of Opportunity on Oct 26 and is coordinated with NuSTAR.



------------------------------------------
        Radiation Belts                     Nov  9
        NGC1167                ACIS-S
        Capella                HRC-S /LETG
        SN2020tcw              ACIS-S       Nov 10
        AT2020xnd              ACIS-S
        ESO543-8               ACIS-S
        SNR0509-67.5           ACIS-S
        UGC2638                ACIS-S       Nov 11
        NGC1167                ACIS-S
        SN2020tcw              ACIS-S
        Radiation Belts                     Nov 12
        SNR0509-67.5           ACIS-S
        WISEAJ053532.12+4011   ACIS-S
        NGC1167                ACIS-S
        MCG-02-08-014          ACIS-S       Nov 13
        SNR0509-67.5           ACIS-S
        NGC1253A               ACIS-I
        NGC1167                ACIS-S
        SDSSJ103315.71+52521   ACIS-S       Nov 14
        SNR0509-67.5           ACIS-S
        Radiation Belts
        GLIMPSE-C01            ACIS-I       Nov 15
        SNR0509-67.5           ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports