During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on May 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). A third real-time procedure was executed on May 8 to uplink two flight software patches. The first patch was to update the gyro calibration misalignment matrix and the second patch was to update the initialization values of the gyro bias vector. Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts May 10
CasACCO ACIS-S May 11
MKN501 ACIS-S
2MASXJ11110059-0053 ACIS-S May 12
NGC5728 ACIS-S
F2M1118-0033 ACIS-S
SPT-CLJ2323-5753 ACIS-I
G349.7+0.2 ACIS-S
Radiation Belts May 13
CasACCO ACIS-S
UGC09448 ACIS-S May 14
J104457 ACIS-S
NGC5728 ACIS-S
J104642.5+022930.0 ACIS-S May 15
SNR0509-67.5 ACIS-S
G349.7+0.2 ACIS-S
Radiation Belts May 16
G1.9+0.3 ACIS-S
SPT-CLJ2323-5753 ACIS-I May 17
RXJ1713.7-3946SW ACIS-I
SPT-CLJ2323-5753 ACIS-I
G1.9+0.3 ACIS-S May 18------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports