News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 1 May 2020 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of SGR 1935+2154, which was accepted as a Target of Opportunity on Apr 28. Time from scheduled observations of H1821+643 and Spiderweb were impacted by the replan and will be rescheduled in a future week.

Real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load.

A Chandra press release was issued on Apr 29 describing a new app to allow anyone to virtually "meet" women who have blazed trails in space and related science fields. This has been released through a collaboration between the Smithsonian and NASA. This augmented reality (AR) app allows users to explore the universe and unlock the often-overlooked stories of women and their contributions to space exploration and science. For details see: https://chandra.harvard.edu/press/20_releases/press_042920reach.html

The schedule of targets for the next week is shown below and includes an observation of Liller 1, which was accepted as a Target of Opportunity on Apr 20 and an observation of PKS 1413+135, which is a follow-up to a Director's Discretionary Time Target of Opportunity which was accepted on Oct 18.



------------------------------------------
        PKS1413+135            ACIS-S       May  3
        Liller1                ACIS-S       May  4
        CassiopeiaA            ACIS-S/HETG
        Liller1                ACIS-S
        CassiopeiaA            ACIS-S/HETG  May  5
        Radiation Belts                     May  6
        RXJ1712.6-2414         ACIS-S/HETG
        KIC11606854            ACIS-S
        RXJ1712.6-2414         ACIS-S/HETG
        CassiopeiaA            ACIS-S/HETG  May  7
        SDSSJ143029.88+1339    ACIS-S
        CassiopeiaA            ACIS-S/HETG
        Radiation Belts                     May  8
        H1821+643              ACIS-S
        SDSSJ143029.88+1339    ACIS-S       May  9
        IC342Center            ACIS-I
        J142615.1+100213.5     ACIS-S
        H1821+643              ACIS-S       May 10
        J135248.3+111410.4     ACIS-S
        J130505.1+071552.0     ACIS-S
        Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports