News by Date
Open and close menu tab
News by Category
Open and close menu tab
Press Resources
Open and close menu tab
Web Shortcuts
Open and close menu tab
Operations CXO Status Report

Friday 3 November 2017 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

A Chandra image release was issued on Oct 31 describing observations of MACS J1149.5+2233 using Chandra, Hubble, and the VLA. This system of merging galaxy clusters is one of six such systems being studied as part of the "Frontier Fields" project. The goal is to use multiwavelength data to learn more about how galaxy clusters grow through collisions. For details see: http://chandra.harvard.edu/photo/2017/macsj1149/

The schedule of targets for the next week is shown below and includes an observation of SN2017egm, which is a follow-up to a Target of Opportunity accepted on Jun 17, and observations of NGC 5907 ULR and Uranus, which were accepted as Director's Discretionary Time Targets of Opportunity on Oct 17 and 29 respectively.



------------------------------------------
        CDWFS                  ACIS-I       Nov  6
        NGC1275                ACIS-S/HETG
        NGC5907ULX             ACIS-S       Nov  7
        Radiation                           Nov  8
        CDWFS                  ACIS-I
        SN1970G                ACIS-S
        NGC1275                ACIS-S/HETG  Nov  9
        SN2017egm              ACIS-S
        NGC1275                ACIS-S/HETG  Nov 10
        Radiation                           Nov 11
        NGC1275                ACIS-S/HETG
        CDWFS                  ACIS-I
        Uranus                 HRC-I
        CDWFS                  ACIS-I       Nov 12
        Uranus                 HRC-I
        CDWFS                  ACIS-I
        Radiation                           Nov 13

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports