News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 November 2016 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

Of note this week was the Chandra Quarterly Review conducted on Nov 2 in Cambridge.

The schedule of targets for the next week is shown below and includes an observation of NGC 3227 coordinated with XMM and NuSTAR.



------------------------------------------
Radiation Belts Nov 8 Abell1795outskirts ACIS-I Perseuscoldfront2 ACIS-I Nov 9 NGC3227 ACIS-S/HETG Abell1795outskirts ACIS-I Nov 10 Radiation Belts Nov 11 Perseuscoldfront2 ACIS-I Abell1795outskirts ACIS-I BootesCy17-1 ACIS-I Nov 12 CygnusA-Nucleus ACIS-I BootesCy17-1 ACIS-I Radiation Belts Nov 13 G292.0+1.8 ACIS-I PSZ1G254.58-32.16 ACIS-S Nov 14 GALEXJ010724.7+1332 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports