News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 8 April 2016 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Apr 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below



------------------------------------------
HD191612 ACIS-S/HETG Apr 11 A1795 (3 obs) ACIS-I Apr 12 HD191612 ACIS-S/HETG NGC4914 ACIS-S Radiation Belts Apr 13 Abell1795outskirts ACIS-I LBQS1212+1445 ACIS-S A1795 ACIS-I Apr 14 NGC4051 ACIS-S/HETG SPT-CLJ0459-4947 ACIS-I Abell1795outskirts ACIS-I A1795 ACIS-I Apr 15 NGC4051 ACIS-S/HETG Radiation Belts Apr 16 SPT-CLJ0640-5113 ACIS-I NGC4785 ACIS-S A1795 (3 obs) ACIS-I A1795 ACIS-I IC4395 ACIS-S IC1185 ACIS-S A2050 ACIS-I SPT-CLJ0459-4947 ACIS-I Radiation Belts Apr 18

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports