News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 6 November 2015 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Nov 5 perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of V5668 Sgr and ASASSN-15lh, which were accepted as a Targets of Opportunity on Oct 5 and 19 respectively, and an observation of SDSS J1724+3135 coordinated with ground-based observatories.



------------------------------------------
Radiation Belts Nov 9 DragonfishAssociati ACIS-I NGC3773 ACIS-S Nov 10 G296.5+10.0-SE ACIS-I 30Doradus ACIS-I NGC1232 ACIS-I RXJ0420.0-5022 ACIS-S Nov 11 Radiation Belts ASASSN-15lh ACIS-S Nov 12 DragonfishAssociati ACIS-I V5668Sgr HRC-S/LETG PSS0133+0400 ACIS-S Nov 13 HAT-P-11 ACIS-S Nov 14 LP347-5 ACIS-S Radiation Belts Abell1367 ACIS-I SDSSJ1724+3135 ACIS-S Nov 15 ZwCl2341.1+0000 ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports