News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 5 June 2015 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jun 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

Of note this week was the release on Jun 2 of CXCDS 10.4 for standard processing, which includes migration of database servers from Solaris to Linux and support for a planned flight software patch to add diagnostic capability to telemetry format 6.

The schedule of targets for the next week is shown below and includes an observation of SNhunt275, which was accepted as a Director's Discretionary Time Target of Opportunity on May 26.



------------------------------------------
SNhunt275 ACIS-S Jun 8 30Doradus ACIS-I Radiation Belts RXCJ1504.1-0248 ACIS-I Jun 9 NGC5044 ACIS-S RXCJ1504.1-0248 ACIS-I Jun 10 Radiation Belts Jun 11 Kes73 ACIS-S SDSSJ1521+0102 ACIS-S Jun 12 RCW38 ACIS-I Mrk1216 ACIS-S Jun 13 NGC2442 ACIS-I Radiation Belts NGC2442 ACIS-I Jun 14 TrianglumAustralis ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports