News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 8 May 2015 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on May 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observation of GRB 150314A, which is a Target of Opportunity follow-up accepted on Mar 19, Centaurus A coordinated with NuSTAR, and observations of Praesepe coordinated with Kepler.



------------------------------------------
NGC5044 ACIS-S May 11 GRB150314A ACIS-S May 12 HD191612 ACIS-S/HETG Radiation Belts May 13 CentaurusA ACIS-S/LETG SgrA* ACIS-S May 14 Abell1795outsk (2 obs) ACIS-I Radiation Belts May 15 Abell1795outskirts ACIS-I May 16 Praesepe ACIS-I CentaurusA ACIS-S/LETG May 17 Praesepe ACIS-I Radiation Belts May 18

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports