News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 15 April 2005 8.30am EDT

During the last week Chandra completed the observing schedule as planned.

Real time procedures were completed on Apr 8 to disable SCS 29 as a clean-up action to the SCS 107 run on Apr 5, and on Apr 13 to perform a routine diagnostic dump of the CPE.

The schedule of targets for the next week is shown below and includes an observation of SGR 1806-20 accepted as a Target of Opportunity.

------------------------------------------
PKS 1421-490 ACIS-S Apr 18 1WGA J1713.4-3949 ACIS-I Terzan 1 ACIS-S Radiation Belts Apr 19 MACS1311.0-0311 ACIS-I AX J1040.3+2045 ACIS-S Apr 20 NGC 6388 ACIS-S 2PIGGz0.061 J0011 ACIS-I Apr 21 RCW103 ACIS-I SDSSJ123215.81+020 ACIS-S Radiation Belts M87 ACIS-S Apr 22 SGR 1806-20 HRC-S 4U 1700+24 HRC-I W3(OH) ACIS-I ESO 351-021 ACIS-S Apr 23

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports