News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 October 2013 9.00am EDT

During the last week the observing schedule was interrupted due to high radiation associated with solar activity. The loads were halted at 10:04pm EDT on Oct 1 through a ground command to execute the SI Safing SCS 107. This ensured that the accumulated radiation dose for ACIS remained below the allowed threshold. All spacecraft actions were nominal. Real-time procedures were executed on Oct 2 to disable SCS-29, which was enabled during the safing sequence, and to update the observation identifier number, to aid CXCDS processing of the interrupted observation. A replanned schedule for resuming science observations was uplinked on Oct 3 with 85.3ks of science loss. The replan also incorporated an observation of GRB130925A, which was approved as a Director's Discretionary Time TOO on Oct 1. Planned observations of HESS J1809-193, 3C340, PGC 3091110, and Deep Field 09 were impacted and will be rescheduled.

A real-time procedure was used to monitor the momentum unloads that were executed from the on-board command loads on Sep 28 and Oct 3; in both cases the unload performance was nominal.

A real-time procedure was executed on Oct 1 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of SN 2013ej, which were accepted as a Target of Opportunity on Sep 4, and an observation of the Crab coordinated with HST.



------------------------------------------
LBN036.00-01.26 ACIS-S Oct 7 B31715+425 ACIS-S 3C226 ACIS-S SN2013ej ACIS-S Crab ACIS-S Oct 8 ngc1187 ACIS-I Radiation Belts G318.13-29.57 ACIS-I HD150136 ACIS-S/HETG Oct 9 Feige34 HRC-I Oct 10 SN2013ej ACIS-S BD+481777 HRC-I 3C352 ACIS-S Radiation Belts Oct 11 SN2013ej ACIS-S M31North ACIS-S/HETG M31Southwest ACIS-S/HETG Oct 12 ngc1232 ACIS-I Oct 13 Radiation Belts ngc1232 ACIS-I Oct 14 ngc1187 ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports