News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 11 March 2005 9.00am EST

During the last week Chandra completed the observing schedule as planned.

An Aspect Camera dark current calibration was performed from the on-board loads on 10 March.

The schedule of targets for the next week is shown below and includes an observation of SDSS J1411+1217 coordinated with ground observations.

The source GRO J1655-40 was accepted on 10 March as a fast turn around (3 day) Target Of Opportunity and will result in a replan of the schedule.

------------------------------------------
EGS-1 ACIS-I Mar 13 DLS J1356-1051 ACIS-I Mar 14 87GB 1243+2248 ACIS-S DLS J1356-1140 ACIS-I cl0328-2140 ACIS-I cl0318-0302 ACIS-I Mar 15 NGC7196 ACIS-S Radiation Belts EGS-1 ACIS-I Mar 16 SDSS J1411+1217 ACIS-S Mar 17 LCDCS 954 ACIS-S MACSJ1359.1-1929 ACIS-I cl1212+2733 ACIS-I G21.5-09 HRC-S Radiation Belts Mar 18 M86 ACIS-I Mar 19 EGS-2 ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports