News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 26 April 2013 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of 4U 1630-47, which was accepted as a Target of Opportunity on Apr 23. Loads for the replanned schedule were uplinked on Apr 24. Planned observations of COSMOS Legacy fields were impacted and will be rescheduled in future weeks.

A real-time procedure was executed on Apr 22 to perform a diagnostic dump of the Control Processing Electronics (CPE).

The schedule of targets for the next week is shown below and includes an observation of NGC 5204 coordinated with XMM.



------------------------------------------
NGC5204 ACIS-I Apr 29 SDSSJ1643+4414 ACIS-S Sh2-27 ACIS-I Radiation Belts Apr 30 COSMOSLegacy ACIS-I G256.45-65.71 ACIS-I May 1 CenANorthernLobe ACIS-I IRASF16399-0937 ACIS-S SDSSJ135024.66+2402 ACIS-S COSMOSLegacy ACIS-I May 2 Radiation Belts WR6 ACIS-S/HETG May 3 PSZ137 ACIS-I May 5

------------------------------------------

All spacecraft subsystems continued to support nominal operations.