News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 January 2013 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of the Crab and 3C 111 coordinated with HST.



------------------------------------------
Radiation Belts Jan 6 DeepField07 ACIS-I DeepField08 ACIS-I Jan 7 COSMOSLegacy ACIS-I NGC2940 ACIS-S Jan 8 ESO323-024 ACIS-S Radiation Belts Jan 9 PSRJ0358+5413 ACIS-I 3C111 ACIS-S Jan 10 Radiation Belts Jan 11 RWAur ACIS-S Jan 12 Crab ACIS-S 4U0728-25 ACIS-S E0102-72S3 ACIS-S SDSSJ1447-0203 ACIS-S Jan 13 SDSSJ094032.25+3113 ACIS-S SDSSJ123915.40+5314 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports