News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 25 February 2005 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Of note this week was a successful ground system interface test with the JPL DSN test facility, DTF-21. The test was was conducted as part of the OCC ground system linux migration test program.

The schedule of targets for the next week is shown below and includes an observation of the LkHa101 Cluster coordinated with the VLA.

------------------------------------------
Radiation Belts Feb 28 3EG J1835+5918 HRC-S 2QZ J114221-01481 ACIS-S Feb 29 SDSS J125055.28-01 ACIS-S SDS 1321+0038 ACIS-S MKW8 ACIS-I SDSS J1408+0205 ACIS-S NGC4760 ACIS-I Mar 2 6C 0905+3955 ACIS-S The Crab Nebula ACIS-S/HETG Radiation Belts PSR J0437-4715 ACIS-S Mar 3 M87 ACIS-I M87 ACIS-I Radiation Belts RCS1107.3-0523 ACIS-S Mar 5 LkHa101 Cluster ACIS-I Mar 6

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports