News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 21 September 2012 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of Swift J1910.2-0546, which was accepted as a Target of Opportunity on Sep 17. A portion of a planned observation of M51 was replaced by the TOO and will be rescheduled in future weeks.

Chandra passed through the sixteenth, seventeenth, and eighteenth eclipses of the season on Sep 14, 17, and 19 respectively, with nominal power and thermal performance.

A real-time procedure was executed on Sep 14 to update the on-board ephemeris. A second real-time procedure was executed on Sep 14 to re-initialize the flight software Thruster Command Processing subfunction in order to prevent the occurrence of an overflow condition.

The schedule of targets for the next week is shown below and includes observations of GRB 120711A, which are from a series of Target of Opportunity observations accepted on Jul 17, and observations of SDSS J121629.13+601823.5 and Holmberg IX X-1 coordinated with the ELVA and HST respectively.



------------------------------------------
A773 ACIS-I Sep 24 HolmbergIXX-1 ACIS-S ArLac (21 obs) HRC-S RXJ0027.6+2616 ACIS-I PSRJ0248+6021 ACIS-I Sep 25 Radiation Belts GRB120711A ACIS-S HD102117 ACIS-S Sep 26 M51 ACIS-S ArLac (21 obs) HRC-I Sep 27 Abell1758 ACIS-I Radiation Belts Sep 28 SPT-CLJ0307-5042 ACIS-I 3c46 ACIS-S Abell1758 ACIS-I PSRJ1459-60 ACIS-I Sep 30 SDSSJ121629.13+6018 ACIS-S Radiation Belts GRB120711A ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.