News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 9 September 2011 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Sep 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observations of GRB 110731A, which is a follow-up to a Target of Opportunity that was accepted on Aug 10, of XTE J1701-407, which was accepted as a Target of Opportunity on Aug 29, and of the Crab, from a series of Director's Discretionary Time TOO observations accepted on Dec 14.



------------------------------------------
Radiation Belts Sep 10 A133-3 ACIS-I A133-4 ACIS-I Sep 12 1RXSJ054747.2-19560 ACIS-S GRB110731A ACIS-S Radiation Belts Sep 13 A133-4 ACIS-I Crab ACIS-S Sep 15 XTEJ1701-407 ACIS-S Radiation Belts A133F ACIS-I Sep 16 PSRJ1028-5819 ACIS-I A133-5 ACIS-I A133E ACIS-I Sep 17

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports