News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 2 September 2011 9.00am EDT

During the last week the observing schedule was replanned to include a 49 ks observation of the source PTF11kly that was accepted as a fast turn-around Target of Opportunity on Aug 26. The replanned loads were uplinked on Aug 27. Planned observations of SPT-CLJ2344-4242, A548e, PSR J1028-5819, SDSS J160918.93+0824, and 3C 314.1 were affected by the replan and will be rescheduled in future weeks.

A real-time procedure was executed on Sep 1 to update the on-board ephemeris.

A Chandra press release was issued on Aug 31 as a NASA press release discussing a Chandra discovery of a pair of supermassive black holes in the center of a spiral galaxy. The galaxy, called NGC 3393, is relatively nearby at a distance of about 160 million light years. The two black holes may be the byproduct of a merger between two galaxies of different sizes a billion or more years ago. For details see: http://chandra.si.edu/press/11_releases/press_083111.html

The schedule of targets for the next week is shown below and includes an observation of Swift J1834.9-0846, which was accepted as a Target of Opportunity on Aug 24, and an observation of M31* coordinated with the VLA.



------------------------------------------
 Radiation Belts                     Sep  5
         SwiftJ1834.9-0846      ACIS-S
         Terzan5                ACIS-S
         A1882b                 ACIS-S
         IGRJ11014-6103         ACIS-I       Sep  6
         A133-4                 ACIS-I
         M31*                   ACIS-S
         SDSSJ101012.65+56052   ACIS-S       Sep  7
         Radiation Belts
         Terzan5                ACIS-S       Sep  8
         PSRJ1103-53            ACIS-S
         SPT-CLJ0040-4407       ACIS-I
         A133-3 (2 obs)         ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports