News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 19 August 2011 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Aug 18 to update the on-board ephemeris.

The schedule of targets for the next week is shown below and includes several Target of Opportunity observations: of SN2011ei (accepted on Aug 10), of GRB 110731A (accepted on Aug 10), of IGR J17498-2921 (accepted on Aug 14), and of Swift J1834.9-0846 (accepted as a Director's Discretionary Time TOO on Aug 10).



------------------------------------------
SN2011ei ACIS-S Aug 21 IGRJ17498-2921 HRC-S Aug 22 GRB110731A ACIS-S LGG345 ACIS-I SwiftJ1834.9-0846 ACIS-S Radiation Belts Aug 23 A133-1 ACIS-I M31 ACIS-I Aug 25 Radiation Belts G149.24+54.18 ACIS-I Markarian3 ACIS-S/HETG Aug 26 A133-1 ACIS-I SPT-CLJ2344-4242 ACIS-I Aug 27 A548e ACIS-I PSRJ1028-5819 ACIS-I HD120136 ACIS-I SDSSJ160918.93+0824 ACIS-S 3C314.1 ACIS-S Aug 28 Radiation Belts Markarian3 ACIS-S/HETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports