News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 March 2011 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Mar 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Mar 2 to update the on-board ephemeris.

The schedule of targets for the next week is shown below and includes observations of SIX-2 and SIX-4 that are coordinated with a ground-based observatory.

------------------------------------------
Radiation Belts                     Mar  6
         XMMUJ1243+1313&J1      ACIS-S       Mar  7
         SIX-2                  ACIS-I
         SDSSJ1252+2640         ACIS-S
         AKARI-NEP-DeepField    ACIS-I
         AKARI-NEP-DeepField    ACIS-I
         PSRJ1958+2846          ACIS-I       Mar  8
         3C410                  ACIS-S
         AKARI-NEP-DeepField    ACIS-I
         M31                    HRC-I
         AKARI-NEP-DeepField    ACIS-I
         1RXSJ130205.2+155122   ACIS-S       Mar  9
         PSS1326+0743           ACIS-S
         1RXSJ144701.1+11453    ACIS-S
         GZ_merger_AGN_12       ACIS-I
         Radiation Belts
         AKARI-NEP-DeepField    ACIS-I
         SIX-4                  ACIS-I       Mar 10
         Abell3112              ACIS-I
         BR0351-1034            ACIS-S
         A853                   ACIS-I
         Abell1668              ACIS-S       Mar 11
         A1795 (4 obs)          ACIS-I
         Radiation Belts                     Mar 12
         A1795 (2 obs)          ACIS-I
         A1882a                 ACIS-S
         NGC3393                ACIS-S       Mar 13
         ACTJ0215-5212          ACIS-I       Mar 14
         SN1987A                ACIS-S/HETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports