News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 February 2011 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Feb 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Feb 3 to update the on-board ephemeris. The schedule of targets for the next week is shown below and includes an observation of XTE J1810-197, which was accepted as Director's Discretionary Time TOO on Jan 11.

------------------------------------------
A1413_Field2 ACIS-I Feb 6 Arp148 ACIS-S Feb 7 UGC03995NOTES01 ACIS-S IGRJ01545+6437 ACIS-I DEML241 ACIS-S Radiation Belts Feb 8 DEML241 ACIS-S SIX-1 ACIS-I XTEJ1810-197 ACIS-S HD163296 ACIS-S Feb 9 NGC6528 ACIS-S 1FGLJ1417.7-4407 ACIS-I Feb 10 SDSSJ1108+0659 ACIS-S SLJ1135.6+3009 ACIS-I Radiation Belts SDSSJ1131-0204 ACIS-S Feb 11 3C196.1 ACIS-S 1E0102.2-7219 ACIS-S/HETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports