News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 7 January 2011 9.00am EST

During the last two weeks Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A second real-time procedure was completed on Jan 6 to update the on-board ephemeris.

The schedule of targets for the next week is shown below

------------------------------------------
Radiation Belts Jan 10 SPT-CL0324-6236 ACIS-I ESO137-002 ACIS-S SDSSJ145828.64+01323 ACIS-S Jan 11 PGC1223766 ACIS-S Jan 12 SDSSJ0945+1009 ACIS-S GZ_merger_AGN_4 ACIS-I 1624+049 ACIS-S A2457 ACIS-I SPT-CL0324-6236 ACIS-I Radiation Belts M31 ACIS-I Jan 13 BlancoCosmological ACIS-S A2204_Field4 ACIS-I LeoT ACIS-S 0907+049 ACIS-S Jan 14 RMCPL1 ACIS-I BlancoCosmological ACIS-S Crab ACIS-S XMMUJ0954+1738 ACIS-S Jan 15 Radiation Belts BlancoCosmological ACIS-S NGC1589-OT ACIS-S Jan 16 IRAS05589+2828 ACIS-S XMMUJ0954+1738 ACIS-S 1FGLJ1511.9-2253 ACIS-I Jan 17 BlancoCosmological ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports