News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 5 November 2010 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Real-time procedures were executed on Nov 1 in preparation for the start of the 2010 summer eclipse season: one to activate SCS 29 and one to dump and clear the EPS glitch counters. Chandra passed through the first and second eclipses of the season on Nov 2 and 5 respectively, with nominal power and thermal performance. A second real-time procedure was executed on Nov 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. A third real-time procedure was completed on Nov 4 to update the on-board ephemeris.

The schedule of targets for the next week is shown below and includes an observation of XB 1832-330 that was accepted as a Target of Opportunity on Nov 3 and an observation of Eta Car coordinated with HST.

------------------------------------------
       Radiation Belts                    Nov  7
       XB1832-330             ACIS-S/LETG Nov  8
       1718-649               ACIS-S      Nov  9
       ESO501-G023            ACIS-S
       Pi3Ori                 HRC-S/LETG
       Radiation Belts                    Nov 10
       PuppisANEfilament      ACIS-I
       NGC4839                ACIS-I      Nov 11
       G299.2-2.9             ACIS-I
       RXJ1131-1231           ACIS-S
       31Com                  HRC-I       Nov 12
       J192607.1+505252       ACIS-S
       AqlX-1                 ACIS-S
       J190822.7+385101       ACIS-S
       Radiation Belts
       PuppisANEfilament      ACIS-I      Nov 13
       G299.2-2.9             ACIS-I
       J194759.9+413111       ACIS-S      Nov 14
       M31                    HRC-I
       A2249                  ACIS-I
       EtaCar                 ACIS-S/HETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.