News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 30 July 2010 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jul 27 to monitor the performance of the MUPS thrusters during a firing at an elevated starting valve temperature. This was the sixth in a planned series of performance demonstrations, which are hoped to allow for the relaxation of the constraint on starting valve temperatures on scheduling momentum dumps. Thruster performance during the dump was nominal. A second real-time procedure was executed on Jul 29 to update the on-board ephemeris.

The schedule of targets for the next week is shown below and includes an observation of TOO_XTEJ1752-223 coordinated with the VLA and observations of GX 13+1 coordinated with RXTE.

------------------------------------------
Radiation Belts Aug 1 TOO_XTEJ1752-223 ACIS-S Aug 2 GX13+1 ACIS-S/HETG Aug 3 PKS2005-489 ACIS-S/LETG Radiation Belts Aug 4 VelaPWN ACIS-S PGC042748 ACIS-S Aug 5 PGC042173 ACIS-S GX13+1 ACIS-S/HETG PKS2005-489 ACIS-S/LETG Radiation Belts Aug 7 SPT-CLJ0307-6225 ACIS-I NGC1439 ACIS-S Q2237+0305 ACIS-S HESSJ1848-018 ACIS-I Aug 8 SDSSJ145200.52+4431 ACIS-S SPT-CL0528-5300 ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports