News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 4 December 2009 9.00am EDT

Operations CXO Status Report, 04 December 2009, 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the second, third and fourth eclipses of the 2009 winter season on Nov 29, Dec 1 and 4 respectively, with nominal power and thermal performance.

A real-time procedure was executed on Dec 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of Mrk 509 coordinated with HST.

------------------------------------------
Radiation Belts Dec 6 PictorAJet ACIS-S Dec 7 HE0435-1223 ACIS-S Perseuscluster ACIS-I M31 ACIS-I Dec 8 M31 HRC-I SDSSJ030417.78+0028 ACIS-S Dec 9 SDSSJ073106.86+3926 ACIS-S SDSSJ082638.41+4305 ACIS-S Radiation Belts PictorAJet ACIS-S Mrk509 HRC-S/LETG Dec 10 PSRJ0633+06 ACIS-S Dec 11 Radiation Belts Dec 12 PictorAJet ACIS-S AlphaCentauri HRC-I Mrk509 HRC-S/LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.