News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 5 June 2009 8.00am EDT

During the last week Chandra completed the observing schedule as planned. Chandra passed through the first three eclipses of the 2009 summer eclipse season on May 28, Jun 2 and 4 with nominal power and thermal performance.

A real-time procedure was executed on Jun 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observation of GRO J1655-40 coordinated with the Australia Telescope Compact Array.

------------------------------------------
Radiation Belts Jun 7 MACSJ0416.1-2403 ACIS-I 1RXSJ082124.5-362848 ACIS-S Jun 8 GRO J1655-40 ACIS-S Abell 2052 ACIS-S NGC 6300 ACIS-S Jun 9 Abell 2052 ACIS-S Radiation Belts EXO0748-676 ACIS-S Jun 10 NGC 6300 ACIS-S Abell 2052 ACIS-S Jun 11 MS0735.6+7421 ACIS-I Radiation Belts Jun 12 GRB 090417B ACIS-S Jun 13 MS0735.6+7421 ACIS-I NGC 6300 ACIS-S Jun 14

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports