News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 3 April 2009 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Apr 2 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below.

------------------------------------------
Abell2052              ACIS-S       Apr  5
WR147                  ACIS-S/HETG  Apr  6
Radiation Belts                     Apr  7
WR147 (2 obs)          ACIS-S/HETG  Apr  8
RXCJ0336.3-4037        ACIS-I
NGC1961                ACIS-I       Apr  9
Bootes Group 33        ACIS-S
1502+106               ACIS-S
F11095-0238            ACIS-S
Abell2052              ACIS-S
Radiation Belts                     Apr 10
WR147                  ACIS-S/HETG
NGC5653                ACIS-S       Apr 11
Tycho's SNR            ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports