News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 19 September 2008 8.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was completed on Sept 15 to update the on-board Ephemeris.

On Sept 17 a procedure was performed from the daily loads to lower the ACIS focal-plane temperature set-point during an extended HRC observation; the set-point was returned to its nominal value prior to the subsequent ACIS observation. The goal of this procedure was to determine the margin available for control of the ACIS focal-plane temperature.

The schedule of targets for the next week is shown below.

------------------------------------------
GRB080307 ACIS-S Sep 22 XTEJ1716-389 ACIS-I H2356-309 HRC-S/LETG RXCJ0449.9-4440 ACIS-I Sep 23 Radiation Belts AEGIS-2 ACIS-I Sep 24 GPS1822-131 HRC-I Sep 25 H2356-309 HRC-S/LETG AXJ181917-1548 HRC-I SGR0501+4516 HRC-I AEGIS-2 ACIS-I Radiation Belts Sep 26 AEGIS-2 ACIS-I Sep 27 RXSJ180326.2 HRC-I H2356-309 HRC-S/LETG EXO1742-326 HRC-I Sep 28 AEGIS-2 ACIS-I

------------------------------------------

All spacecraft subsystems continued to support nominal operations.