News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Monday 24 April 2000 9.30 EDT

During the last week, Chandra completed the observing schedule as planned.

A new version of the Off-Line System (OFLS release 8.1A) was installed on the operational strings on 4/19 following completion of acceptance testing at the OCC. The release provides several enhancements and a number of fixes including allowing target offsets for roll constrained observations and correctly calculating the LGA visibility with allowance for Sun shade door blockage. The new release was used to build the schedule and command loads for the week of April 23.

The planned observations for next week are as follows.

------------------------------------------
Cyg X-2 HRC-I/LETG Apr 24 MS 1621.5+2640 ACIS-I 44 Boo ACIS-S/HETG Apr 25 AX J1951+5609 ACIS-I Radiation Belts V404 Cyg ACIS-S Apr 26 NGC 4258 HRC-S/LETG NGC 5033 ACIS-S Apr 28 Radiation Belts A1835 ACIS-S Apr 29 RX J1347-114 ACIS-S NGC 5236 (M83) ACIS-S Vela Pulsar ACIS-S Apr 30 E0102-72.3 ACIS-I 1E 0056.8-7154 ACIS-S V1223 SGR ACIS-S/HETG Radiation Belts May 1

------------------------------------------

The spacecraft subsystems continued to operate nominally.