News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Wednesday 8 December 1999 8.00am EST

During the last 48 hours, Chandra completed observations of RX J1159+5531 with ACIS-I, a long observation of the Lockman Hole with HRC-I and passed through the radiation belts with the associated ACIS CTI measurements.

Final preparations are being made for the uplink and testing on-orbit of the SI Safing software patch. The patch will ensure that in the event of a safing action by the spacecraft, the Science Instruments will be placed in a safe configuration for high radiation environments. The uplink and test is scheduled for 2pm Monday Dec 13.

During the next 48 hours Chandra will perform a series of calibration observations of Ar-Lac with HRC-I, observations of NGC 1068 with HRC-S [ACIS-S; rjb], RXJ0439.0+0715 with ACIS-I, and BAL 0256-0119, NGC 1138 and NGC 7618 with ACIS-S.

The spacecraft subsystems continued to operate nominally.





Return to Status Reports