News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chandra Mobile
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Wednesday 8 September 1999 10.00am EST

Operations continued as expected with Chandra during the last 24 hours. Observations continued with ACIS-I of PKS 0312-77 and HR1099 for the off-axis point response function measurements, and ACIS pile-up characterization. All performance was nominal.

The next mission planning load was completed and reviewed and was uplinked to the spacecraft during a communications pass at 3AM 9/8. This load (P12) will begin to operate at 10.30AM on 9/8.





Return to Status Reports