News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 19 March 2004 10.30am EST

During the last week the observing schedule was replanned to include an observation of GRS 1915+105 that was approved as a fast turn-around Target Of Opportunity (TOO) on 16 Mar. Loads were replanned and uplinked on Mar 18 for observing Mar 20. Observations of HH 300 and Alpha CrA were impacted by the TOO and will be rescheduled for a later load.

A real-time procedure was completed on Mar 13 to perform a manual unload of momentum. The unload was performed at an attitude that ensured a cool starting temperature and thruster performance was nominal throughout the unload.

A real-time procedure was completed on Mar 15 to update the on-board ephemeris.

Of note last week was the Chandra Cycle 6 proposal deadline at 6pm EST on March 12. A total of 785 GO proposals were received and the submission process proceeded smoothly.

The schedule of targets for the next week is shown below and includes an observation of M81 coordinated with HST.

------------------------------------------
Radiation Belts Mar 21 IRAS05436-0007 ACIS-S Xi Per ACIS-S/HETG Radiation Belts Mar 24 eta UMa ACIS-I H1743-322 ACIS-S LBQS 2140-4552 ACIS-S CXOU J010043.1-721 ACIS-S Mar 25 M81 X-9 ACIS-S alpha Lac ACIS-I F1320-4207 ACIS-S 2123-463 ACIS-S G21.5-09 HRC-I G21.5-09 HRC-S NGC 5427 ACIS-S Mar 26 SDSS J131058.14+01 ACIS-S G21.5-09 ACIS-I Radiation Belts H1743-322 ACIS-S Mar 27 SN1995N ACIS-S FTM 1022+1929 ACIS-S Mar 28 QSO 0910+564 ACIS-S 2dF Selected Group ACIS-I SDSS J113345.62+00 ACIS-S M87 ACIS-S Mar 29

------------------------------------------

All spacecraft subsystems continued to support nominal operations.