News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 7 December 2007 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Dec 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes observations of NCG 1023 coordinated with HST and AEGIS coordinated with Spitzer.

------------------------------------------
Draco ACIS-S Dec 9 3C332 ACIS-S 3C315 ACIS-S Dec 10 SDSS J133701.39-02 ACIS-S Radiation Belts AEGIS-1 ACIS-I 3C 186 ACIS-S Dec 11 NGC2563-P2 ACIS-I SDSS J074610.50+23 ACIS-S Dec 12 NGC1023 ACIS-S Radiation Belts AEGIS-1 ACIS-I Dec 13 074345.47+480813.5 ACIS-S NGC2563-P5 ACIS-I Dec 14 V1118 Ori ACIS-S SN 2006gy ACIS-S Draco ACIS-S Dec 15 Radiation Belts AEGIS-1 ACIS-I Dec 16 3C197.1 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports