News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 7 September 2007 8.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Sep 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below.

------------------------------------------
CGCG 448-020 ACIS-S Sep 10 ESO 239-IG002 ACIS-S IRAS F01364-1042 ACIS-S SDSS J013416.34+00 ACIS-S A2744 ACIS-I SNR1987A ACIS-S/LETG Radiation Belts Sep 11 SNR1987A ACIS-S Sep 12 Cen X-3 ACIS-S/HETG SNR1987A ACIS-S/LETG A2065 ACIS-I NGC 2392 ACIS-S Sep 13 HCG 7 ACIS-S Radiation Belts Sep 14 SNR1987A ACIS-S/LETG CPD-572874 ACIS-I Sep 15 NGC2563-P4 ACIS-I HCG 7 ACIS-S SNR1987A ACIS-S/LETG Sep 16 NGC 1703 ACIS-S A3158 ACIS-I UGC 1922 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.