Friday 7 September 2007 8.00am EDT
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was executed on Sep 5 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. The schedule of targets for the next week is shown below. |
------------------------------------------
CGCG 448-020 ACIS-S Sep 10
ESO 239-IG002 ACIS-S
IRAS F01364-1042 ACIS-S
SDSS J013416.34+00 ACIS-S
A2744 ACIS-I
SNR1987A ACIS-S/LETG
Radiation Belts Sep 11
SNR1987A ACIS-S Sep 12
Cen X-3 ACIS-S/HETG
SNR1987A ACIS-S/LETG
A2065 ACIS-I
NGC 2392 ACIS-S Sep 13
HCG 7 ACIS-S
Radiation Belts Sep 14
SNR1987A ACIS-S/LETG
CPD-572874 ACIS-I Sep 15
NGC2563-P4 ACIS-I
HCG 7 ACIS-S
SNR1987A ACIS-S/LETG Sep 16
NGC 1703 ACIS-S
A3158 ACIS-I
UGC 1922 ACIS-S
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports