News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 7 June 2007 8.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jun 6 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes a time-constrained observation of RXJ1131-1231.

------------------------------------------
Radiation Belts Jun 11 RXJ1131-1231 ACIS-S NGC 6826 ACIS-S NGC5846 ACIS-I Jun 12 A2218 ACIS-I Jun 13 A2125 ACIS-I NGC 2082 ACIS-S Abell 3266 ACIS-I AX J162246-4946 ACIS-S Radiation Belts Abell 2744 ACIS-I Jun 14 AX J184400-0355 ACIS-S NGC 6826 ACIS-S Rabbit ACIS-I IC 5063 ACIS-S Jun 15 Radiation Belts Jun 16 LHA 120-N 11 ACIS-I NGC 2139 ACIS-S Jun 17

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports