News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 8 September 2006 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on 7 September to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for next week is shown below and includes an observation of IGR J00291+5934 coordinated with ground-based observations.

------------------------------------------
IZw107 ACIS-S Sep 11 P5 ACIS-I Vega HRC-I Vega (3 obs) HRC-S Radiation Belts M33 Field 3 ACIS-I Sep 12 IGR J00291+5934 ACIS-S Sep 13 G292.0+1.8 ACIS-I Radiation Belts Sep 14 G12.7-0.0 ACIS-I XMMU J2235.3-2557 ACIS-S Sep 15 Deep GCS 10 ACIS-I P12 ACIS-I SDSS J1421+4633 ACIS-S SDSS J1407+6454 ACIS-S SDSS J1438+4314 ACIS-S 1RXS J151855.1+355 ACIS-S Q2237+0305 ACIS-S Sep 16 PSR J1112-6103 ACIS-S GCRT J1746-2757 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.