News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 31 March 2006 9.00am EST

During the last week the observing schedule was replanned to include an observation of SGR 1900+14 that was accepted as a 3 day turn-around Target Of Opportunity (TOO) on Mar 26. Loads were replanned and uplinked on Mar 28. An observation of NGC 1672 was impacted by the TOO and observations of SDSS J2123-0050 and A2125 were added the schedule as a result of the re-plan.

The schedule of targets for next week is shown below and includes a calibration observation of PKS2155-304.

------------------------------------------
NGC 4204 ACIS-S Apr 2 IC342 HRC-I SDSSJ2125-0813 ACIS-S PKS2155-304 ACIS-S/LETG E0102-72 ACIS-I Apr 3 Radiation Belts PG1520+525 HRC-S/LETG NGC 3801 ACIS-S Apr 4 PG1520+525 HRC-S/LETG Apr 5 NGC 4245 ACIS-S NGC 4274 ACIS-S Radiation Belts PG1520+525 HRC-S/LETG Apr 6 WR 140 ACIS-S/HETG Apr 7 LSI+61303 ACIS-I NGC 4310 ACIS-S Apr 8 NGC 4448 ACIS-S NGC 4020 ACIS-S Radiation Belts HE 1104-1805 ACIS-S Apr 9 NGC3379 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports