News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 20 January 2006 9.00am EST

During the last week Chandra completed the observing schedule as planned.

Chandra passed through the final two eclipses of the 2006 winter season on Jan 14 and 17 with nominal power and thermal performance. A real-time procedure was executed on Jan 17 to disable SCS 29 as a standard action following the eclipse season.

A realtime procedure was completed on Jan 18 to update the on-board Ephemeris.

Of note last week was the conduct on Jan 18 of the 2006 Chandra Fellows Peer Review.

The schedule of targets for next week is shown below.

------------------------------------------
NGC3379 ACIS-S Jan 23 cl1357+6232 ACIS-I Jan 24 Radiation Belts NGC 3600 ACIS-S Jan 25 NGC 3344 ACIS-S Abell754-P5 ACIS-I HZ43 HRC-I/LETG Cygnus X-3 ACIS-S/HETG IRAS08572+3915 ACIS-S Jan 26 Cygnus X-3 ACIS-S/HETG Radiation Belts Jan 27 Abell754-P2 ACIS-I Abell754-P3 ACIS-I SNR1987A ACIS-S Jan 28 Abell754-P6 ACIS-I Abell754-P7 ACIS-I AM 2049-691 ACIS-S NGC 3640 ACIS-S Jan 29 cl1357+6232 ACIS-I SDSS J1001+5454 ACIS-S SDSS J0950+5801 ACIS-S NGC 7013 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports