News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 14 October 2005 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on 13 Oct to perform a routine Electrical Interface Assembly (EIA) Sequencer self-check.

A Chandra press release was issued on 13 Oct describing observations of a new generation of stars spawned by a super-massive black hole at the center of the Milky Way galaxy. This novel mode of star formation may solve several mysteries about these super-massive black holes that reside at the centers of nearly all galaxies. For details see:
http://chandra.harvard.edu/press/05_releases/press_101305.html

The schedule of targets for next week is shown below and includes Director's Discretionary Time observations of IGR J12349-6434 and Alpha Centauri.

------------------------------------------
Radiation Belts Oct 16 EGS-7 ACIS-I ZwCl 2341.1+0000 ACIS-I Oct 17 ArLac HRC-I EGS-7 ACIS-I AR Lac (4 obs) HRC-I PSR B1509-58 ACIS-I GC-1 HRC-I Oct 18 SDSS J233837.10-00 ACIS-S Radiation Belts IGR J12349-6434 ACIS-S/HETG Oct 19 VV 114 ACIS-S GC-2 HRC-I Oct 20 GC-3 HRC-I GC-7 HRC-I GC-8 HRC-I GC-9 HRC-I GC-10 HRC-I Alpha Centauri HRC-I PSR J1649-4349 HRC-I Oct 21 Abell 2589 ACIS-S Radiation Belts HD93250 ACIS-S/HETG RXJ0419.6+0225 ACIS-S Oct 22 Cas A ACIS-I Oct 23 Cas A ACIS-S Cas A HRC-I RCS2319.9+0038 ACIS-S PKS 1030-357 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.